The site work changes what the job takes
An outdoor unit needs a pad or mounting brackets, clear space around it for airflow, and a line set run to wherever the indoor air handler goes. If that path has to cross a finished wall, go through tight framing, or run further than a straightforward install allows, the labor and materials to get refrigerant line and wiring from one end to the other add to the job. Electrical work factors in too. A heat pump with backup strips draws more than many existing circuits are built for, and if the panel doesn't have room or capacity for a new dedicated circuit, that's its own piece of work before the unit ever gets set.






